×

An L.A. Bath Remodel Reveals a Wet Room-style Vibe

Teaming up with a woman general contractor in L.A., a remodel partnership delivers a dream bathroom

Family portrait of homeowners in Hyde Park Los Angeles

  • Homeowners: First-time homeowners Liz and Kevin posted a bathroom remodel on Sweeten 
  • Where: Hyde Park / Windsor Hills neighborhood
  • Primary renovation: Repairing water damage and remodeling the bathroom in a house built in 1923
  • Homeowner’s quote: “Sweeten’s consultation phone call let me bring all my bids and talk them through with a trusted partner,” Liz said. “Sweeten helped me understand how to compare different line items, to think through what could be missing, and come up with clarifying questions to ask.”

“After” photos by Madeline Tolle. Stylist: Emily Bowser.

Turn a must-do gut reno into a custom primary bath remodel

When they bought the Spanish Revival Mediterranean in South L.A.’s Park Mesa Heights, they’d pulled off a victory: a first-time home purchase in SoCal. But Liz and Kevin’s 1923 house had a secret: water damage beneath the primary bathroom floor, thanks to a shower pan installed incorrectly a decade before. “To deal with it,” said Liz, the executive director of an education nonprofit, “we needed to take the bathroom down to the studs.” With this, Liz and Kevin started planning for a bath remodel in their L.A. home.

bathroom before
77981-Liz-Before-03
 

women general contractors

orange tile

Liz and Kevin, a technical production senior manager, viewed the dank discovery as an opportunity “to add storage and maximize space,” Liz said. But also to showcase their style. The two Mid-Century enthusiasts, who live with daughters Omari and Naiobi, love each piece they’ve hand-picked for the 1,850-square-foot home; they wanted elements of the era in the new bathroom as well. When they happened on a vintage-modern walnut dresser they liked, Liz envisioned it in a new role as a vanity. “We purchased it without knowing what the conversion would entail,” she said. Finding a contractor who could turn it into a sink while retaining drawer space below was key to their search. 

repurposed vanity table

colorful bathroom tile

“The crew was on time, and clear about decisions they needed to be made,” Liz said. “Staying on the same page with your contractor ensures your project is executed precisely and saves you money.”

A general contractor that’s the right fit

Liz had already received bids from two recommended contractors, she said, but neither wanted to do the dresser/vanity retrofit. “I wondered if I might have a different experience communicating with a woman contractor if only I could find one,” remembered Liz. Then she came across Sweeten, posted their project, and was matched with a woman-owned contracting firm. “Her bid came in lower than the others,” Liz said, “and her communication was more clear and direct.”

Build an on-trend bathroom with vintage-modern flair

With a general contractor who’d take on the vanity challenge now checked off, Liz turned to other essentials. They would deal with the water stagnating under the floor. The room would also have a clean, uncluttered, and functional aesthetic. Spa-like, but not sterile. “It’s a bathroom,” she said, “not a museum!”

Renovate to live, Sweeten to thrive!

Sweeten brings homeowners an exceptional renovation experience by personally matching trusted general contractors to your project, while offering expert guidance and support—at no cost to you.

Start your renovation

free standing bathtub with brushed gold faucet and fixtures and white and gray floor tiles and light gray walls and pendant light after renovation

wet room bathroom

Creating a “wet room” feel

Initially, they planned for a seamless look—the same tile for the bath floor and shower floor, no curb. They’d discussed keeping the floorplan, but breaking out with a separate shower and soaking tub. The contractor suggested, however, that they move things around, repurposing the toilet alcove as a long, spacious stall comprising of a shower and tub.

They had chosen a large, vintage-feel tile which was fine for the bathroom floor but not the shower floor. A small mosaic, instead, would allow a drainage slope, and a curb would be necessary to contain pooling water. “We struggled to get on board,” Liz said. “But once we did, it was smooth sailing.” Demolition revealed the water problem to be less serious than they’d feared. They were rolling.

Multiple showstopping designs

The dresser-turn-vanity plan proceeded. Liz found a high-rimmed, shallow trough sink that would float above the drawer space beneath. The sink’s height would also raise the low-sitting dresser up to standard vanity height. Brushed-brass faucets match the shower fixtures. Old-school, frameless medicine cabinets sit mounted on a wall of vibrant penny-round tile. (“The orange,” Liz said, “felt like a risk, but a little playful, like us.”) Milk-glass pendant lights complement the shape of the tiles. Swivel towel racks offer space to air-dry towels or clothing.

stand-in shower with brushed gold shower head and fixtures and recessed shelf with gold frame and white walls and free standing bathtub after renovation

brushed gold shower head and fixtures and recessed shelf with gold frame after renovation

bathroom gold faucet and fixtures and rectangular overflow cover after renovation

Deliveries during a pandemic

Putting pieces together proved perplexing. “This was our first renovation project and without a designer,” Liz explained. “Taking on that role myself meant dealing with myriad decisions.” During a pandemic, it was harder. Shipping delays defied the contractor’s requirement that all finish materials be on-site before demolition could begin. “I wanted to see elements laid out before deciding,” Liz said, but plumbing or electrical couldn’t wait. By the time multiple pendants arrived for Liz to view over the tub, the electrician had already installed wiring for a previously planned recessed light. “We paid to bring him back,” Liz said.

Communicating with your contractor

During the job, the Sweeten general contractor was capable and professional. “The crew was on time, and clear about decisions they needed to be made,” Liz said, reminding renovators to also ask for the answers they need. “Staying on the same page with your contractor ensures your project is executed precisely and saves you money.” The reno cost $26,000 ($19,000 to the contractor, and $7,000 for finish materials), allowing Liz and Kevin to stay on budget. Since they’d been braced for costly water damage (and possibly mold) remediation, it felt like a fortunate break.

The final result was an absolute win. “The vanity, to me,” Liz said, “is the centerpiece of the room (even though most people comment on the soaking tub!). It makes our bathroom unique and adds warmth and depth.”

Bonus: Comparing bids can be frustrating. The couple’s brain saver: “Sweeten’s consultation phone call let me bring all my bids and talk them through with a trusted partner,” Liz said. “Sweeten helped me understand how to compare different line items, to think through what could be missing, and come up with clarifying questions to ask. Sweeten’s bid-leveling expert helped me look at payment terms and project management. This helped us feel confident about signing our contract.”

Thank you, Liz and Kevin, for sharing your L.A. bath remodel with us! 

Sweeten handpicks the best general contractors to match each project’s location, budget, and scope, helping until project completion. Follow the blog for renovation ideas and inspiration and when you’re ready to renovate, start your renovation on Sweeten.

Renovation Materials

BATHROOM RESOURCES:

  • Dimensions Artifice ceramic shower and wall tile in matte white; Akura Marengo porcelain floor tile in matte gray; Mar Bianco Dolomite 2″ hex polished marble mosaic shower floor tile; Maravilla Rosso Venato polished-marble shower niche tile; Festival porcelain penny backsplash tile in Turmeric: Floor & Decor
  • Pfister tenet shower column with shower head and arm in brushed gold: Pfister
  • Neodrain 24″ linear drain in brushed gold; KES swivel towel rack in brushed gold: Amazon
  • 59” acrylic freestanding soaking tub: Woodbridge 
  • Kingston Brass Concord wall-mount Roman tub faucet and Concord sink faucet in brushed brass: Kingston Brass 
  • Caspian elongated toilet: Glacier Bay
  • 47″ double trough sink in glossy white: Homary
  • Kohler Archer frameless medicine cabinets: Kohler
  • Sculptural brass pendant with 8” milk glass globe vanity lighting; Sculptural brass pendant with 15” milk glass Geo shade (over tub): West Elm

Originally published February 11, 2021

Updated on April 21, 2023

You may also like

Renovate with Sweeten!

sweeten-magic

We’ll match you with vetted general contractors and offer support until your project is done — at no cost to you!

Start your renovation

Customer review 5.0

sweeten-thumbsup

“Sweeten was really helpful — we wouldn't have found our contractor without them, and the bid-leveling call was absolutely essential for us.”

— Dara R. from New York, NY

Read more reviews —>
Start your renovation
no-cost-blue

Subscribe to our
renovation newsletter